Repair update :-
Boxing in of the projector cables complete.
Door step board fitted, it's taken 4 months to get the board but picked it up yesterday after uttering a few threats to my architect. What do you know, it did not fit, too long & too wide but it was stained & finished well. Managed to trim it to fit without damaging the finish then stuck down with 'No Nails'.
Switch for the redundant ceiling fan removed, hole filled & painted. I would like to have kept it there as a 'just in case' but I will be fitting an acoustic panel in that position,
Stage carpet fitted & the 3 edges tucked, front will be stuck to the nosing tomorrow. A bit slow on this as my 1st attempt at carpet laying & having to repair the underlay (padding) that the guys who took up the floor tore apart.
Everything is going to schedule even though we've had a few hiccups so well pleased.
The stage area.