Wednesday Aug. 13th
Things didn't go quite to plan today, arrived on site to find the door makers modifying the HT door frame. They made the allowance for the rubber sealing strip on the wrong faces of the frame, more work for the decorators. That coupled with the baseboard repairs (over zealous fitting of the carpet gripper) means the HT room will be complete this weekend except for the electrics & air con. unit. Monday will be my last day before we have our holiday so hopefully fit the speaker brackets then & maybe the front high speakers. I managed to clean the carpet except for the seat riser which is covered due to the work being done on the door frame. I also cleaned the cables, I made the mistake of not keeping the cables covered all the time. It was not so much the sanding dust but sealant that was plastered on them but all OK now.
In case anyone is wondering what the hole in the middle of the seat riser front face is for, it will house the power supply for the LED step lighting & will be covered by a black grille.
The orange flexible conduit underneath the screen mount is the cable for the door bell light/buzzer or both (haven't decided yet. In case we're all in the HT I thought we ought to have some notification of visitors
Stage - right hand side.
Stage - left hand side.
Looking towards right seat riser steps from the stage.
Looking towards left seat riser steps from the stage.